Port Rivalry
Gwadar Port dredging Maintenance dredging of the navigational channel of Gwadar Port is estimated to cost $ 18 million incorporating maintenance dredging of navigational channel, basin and berthing area extending over 4.70 km . The designed draft of the turning basin and berths is 13.8 m while the outer navigational channel's designed draft is 14.5